• Critz Mercedes Benz, BMW & Buick-GMC, Savannah, GA

    Critz Reflects Better the Best Cars’ Brand Images Now Hussey Gay Bell has designed three new facilities for the Critz family of dealerships in Savannah.  The first consisted of the renovation of the existing Mercedes-Benz dealership.  The 9,000 SF showroom sits on the corner of a nine-acre facility and features a service drive and write […]

  • Toombs County Courthouse, Lyons, GA

    Toombs County Courthouse and Detention Center The project consisted of the development of a feasibility study for the Toombs County Courthouse and Detention Center, which provided the Toombs County Commission with the most viable option to develop a Courthouse and Detention Center to house all court functions and all County administrative offices, as well as […]

  • J.C. Lewis Ford Dealership, Statesboro, GA

    A Ford Dealership Features New Ford Prototype Aesthetics The project consisted of the design and construction of an approximately 21,000 SF new Ford dealership on an 8.8-acre site located at 6922 Veterans Memorial Parkway in Statesboro, GA. The building design was based on the 2016 Ford 750 Prototype, with a few minor modifications: the 9,900 […]

  • Boeing Land Development Projects, North Charleston, SC

    600+ acre multi-county Industrial/Commercial Park Boeing acquired Vought Aircraft/Global Aeronautica in 2008 and announced plans for a new Boeing 787 manufacturing facility adjacent to the Charleston International Airport in 2009. The firm was retained to perform site/civil design, surveying and permitting, landscape and boardwalk design, boundary and topographic surveys to ALTA surveys for property acquisitions, […]

  • Fort Stewart Elementary School, Fort Stewart, GA

    Fort Stewart Elementary School (Kessler Elementary School) Project consisted of the construction of a new pre-kindergarten through 6th grade elementary school to serve 400 students, which was required at Fort Stewart to accommodate enrollment increases due to new housing being built for the Army’s Residential Communities Initiative. The new elementary school is a one-story 80,788 […]

  • Mitsubishi Hitachi Power Systems America, Pooler, GA

    Mitsubishi Expands As Turbines Wheel Faster With an extensive history of providing high-quality parts and services to the North American market, it became critical for Mitsubishi Power Systems America (MPSA) to expand their facilities. MPSA needed to increase production of key gas turbine parts, provide complete steam turbine services and assemble advanced, fuel-efficient gas turbines. […]

  • 2,300-Acre Waterways Township, Bryan County, GA

    Experiencing Life on the Water:  2,300 Acres of Scenic Development Hussey Gay Bell continues to provide planning and design services for this 2,300-acre self-contained residential and commercial community development which consists of approximately 2,900 single family residential units, 300 resort units, a 25-acre municipal utility complex, 200-acre golf course, 100-acre mixed-use village center and amenity […]

  • GPA Multi-Modal Connector Survey, Savannah, GA

    Historic Firm Survey Supports Historic Port Connector Project In conjunction with The Port of Savannah International Multi-Modal Connector project, which will link Garden City Terminal’s two rail yards to improve efficiency and to grow the terminal’s rail lift capacity, Moffat & Nichol contracted Hussey Gay Bell to perform overall boundary, topographic and wetlands surveys as […]




  
  • Piedmont Equine Center, Madison, GA

    The Facility Grows as Care Grows Piedmont Equine Associates, located on 26 acres just off Highway 441 in historic Madison, Georgia, is a full-service equine clinic offering ambulatory and hospital care, 8 large pastures and 5 smaller paddocks for long-term non-intensive patients and rehabilitation cases.  Due to continued growth in clientele and services, the space […]

  • Camden County Intersection, Camden County, GA

    GDOT Camden County Intersection Improvements This project includes the design and construction of intersection improvement to the Northbound ramp termini at the I-95 Northbound Ramp @ CS 532 / St. Mary’s Road intersection in Camden County. The proposed improvements are roundabouts at two separate intersections, the I-95 Northbound off-ramp and at Haddock Road. The roundabouts […]

  • Palmetto Hall Plantation, Hilton Head Island, SC

    1,000 Acre Palmetto Hall Plantation Master Planning & Design Hussey Gay Bell planned and designed this unique 1,000-acre project, which is one of the finest overland flow wetlands projects to receive advance waste treatment effluent in South Carolina. The project has been acclaimed by state and federal review agencies as a model for the use […]

  • Dean Forest Road 24” Main, Savannah, GA

    Connecting Savannah, Pooler and Garden City Through Water Service The existing water main follows the Dean Forest Road corridor of the City of Savannah, with property on either side existing within the City of Pooler and Garden City. As a result, the City had no water service paying customers along the existing route. The impetus […]

  • Master Plan & Contingency Plan, Charleston, SC

    A Sewer Tunnel System Replacement & Contingency Plan As a result of the STAG monies obtained through the Corps of Engineers, Hussey Gay Bell and Black & Veatch teamed to produce a Master Plan for the replacement of Charleston Water System’s failing sewer tunnel system. Hussey Gay Bell’s task also included the preparation of a […]

  • 0.5 MGD Fripp Island WWTP, Fripp Island, SC

    A wastewater treatment plant on a sensitive natural tract This project consisted of a new 0.5 MGD hollow fiber (GE ZeeWeed) membrane bioreactor (MBR) plan constructed on a very sensitive tract of unused land surrounded by a golf course and residential properties.  This site required construction on an extremely small footprint and continued operation of […]

  • Sweetwater Apartments, Charleston, SC

    Beautiful Waterfront Development along the Picturesque Beresford Creek The project consisted of a 320-unit apartment complex constructed overlooking Beresford Creek in Berkeley County. The development consists of 3-story and 4-story buildings, separate garage buildings, 4 docks and boat ramp on the creek, luxurious amenity building, pool and pavilions for use by the residences. It was […]

  • Natural Gas System, Crockett County, TN

    Natural Gas Extension to Serve Gadsden and Surrounding Area The Crockett Public Utility District Natural Gas Extension to the Town of Gadsden has made high quality natural gas service available to approximately 250 potential new customers including an elementary school, a cotton gin, churches and residences, providing significant savings and convenience when compared to alternate […]

  • Whole Foods at West Ashley Station, Charleston, SC

    Antiquated Shopping Center Revitalized through Smart Development West Ashley is the key to future development for the City of Charleston.  As the Charleston area is projected to reach 1 million inhabitants in the next ten to fifteen years, much of that development and densification is expected to happen in the West Ashley area. West Ashley’s […]