• Key Slot, Godley Station & Towne Lake, Pooler, GA

    A Phased Approach to Planning Growth This project consisted of the design and installation of approximately 5,400 LF of 12-inch diameter C-900 PVC force main. The project included pump station upgrades at Key Slot which comprised of the replacement of existing submersible pumps, including pipe connection modifications; replacement of existing check and plug valves and […]

  • Gwinnett Street Widening, Savannah, GA

    Gwinnett Street: Improvements for Motorists & Pedestrians Improvements consist of adding two additional lanes and a 20′ raised grass median. The widening was accomplished to the south of the existing lanes. The section included 30-inch curb and gutter and 5-foot sidewalks on both sides of the road separated from the curb by a 2-foot grass […]

  • BJWSA Water & Sewer Master Plan, Jasper County, SC

    Two Alternatives for Future Development The purpose of this document was to provide a master plan for a water distribution system to serve the potential developments outlined in the Land Use Study of South Jasper County. This Master Plan evaluates two alternatives for source water to South Jasper County; additional groundwater wells or master metered […]

  • Chatham Parkway Rehabilitation, Garden City, GA

    Rehab of a Main Arterial in Port City, Garden City Funded by a combination of several sources including SPLOST, stormwater enterprise funds, and grants from GDOT, the project featured the rehabilitation of a deteriorating 5-lane urban arterial in the port city of Garden City, home to the Georgia Ports Authority Garden City Terminal – the […]

  • East Cooper Water Supply No. 2, Charleston, SC

    60,000 Residents Receive Drinking Water, Fire Protection An ACEC-SC-award winning project, this project reached final completion in 2007. Hussey Gay Bell played a crucial role in the success of Charleston Water System’s East Cooper Water Supply #2 project. Had this project not been completed, it would have resulted in a limited water supply for consumption […]

  • Sweetwater Apartments, Charleston, SC

    Beautiful Waterfront Development along the Picturesque Beresford Creek The project consisted of a 320-unit apartment complex constructed overlooking Beresford Creek in Berkeley County. The development consists of 3-story and 4-story buildings, separate garage buildings, 4 docks and boat ramp on the creek, luxurious amenity building, pool and pavilions for use by the residences. It was […]

  • Mincey Marble, Gainesville, GA

    Marble Manufacturer Expands:  Economy In Hall County Grows Mincey Marble has been doing business in Hall County for 40 years, employing over 300 people.  They currently manufacture cultured marble shower pans and surrounds that are used mostly in the hotel industry, which are shipped all around the country. By January 2017, they had outgrown their […]

  • Academic Building 2 Renovation, Swainsboro, GA

    A Technical Education for the Twenty First Century Hussey Gay Bell served as the design partner for TCSG’s Southeastern Technical College Building 2 Academic Building Renovation project. Led by Macon-based builder, Chris R. Sheridan & Co., the $3.56 million design-build project featured the renovation of approximately 38,375 square feet. The newly renovated 39,593 square foot […]

  • Dunes West Master Planning, Mt. Pleasant, SC

    A 4,800-Acre Beauty, Dunes West Master Planning & Designs Hussey Gay Bell provided master planning and complete designs for portions of this 4,800-acre project in Charleston County, South Carolina. This upscale residential resort community is one of the premier developments along the South Carolina coast. Hussey Gay Bell provided infrastructure design under adverse and difficult […]




  
  • Secession Effluent Force Main, Beaufort, SC

    A World Record Is Set Under Navigable Waters From 2006-2007, Hussey Gay Bell provided professional services to Beaufort-Jasper Water & Sewer Authority (BJWSA) for complete engineering design of 5,000 LF of fused 10-inch PVC DR 14 effluent force main installed using horizontal directional drilling; 3,000 LF of 10-inch PVC effluent force main installed using direct […]

  • Master Plan & Contingency Plan, Charleston, SC

    A Sewer Tunnel System Replacement & Contingency Plan As a result of the STAG monies obtained through the Corps of Engineers, Hussey Gay Bell and Black & Veatch teamed to produce a Master Plan for the replacement of Charleston Water System’s failing sewer tunnel system. Hussey Gay Bell’s task also included the preparation of a […]

  • Beaufort Fire Station No.2, Beaufort, SC

    A Seamless Blend of Low Country Charm & Public Safety For this $2.8M Design-Bid-Build project, Hussey Gay Bell provided professional architectural and engineering services for this new facility which consists of a 10,000 SF, two-story, fire station on a 1.2-acre parcel. The building is located at the front of the site as required by the […]

  • Great Swamp Effluent Disposal Expansion, Beaufort, SC

    Great Swamp Effluent Disposal Expansion Hussey Gay Bell provided engineering services in connection with Beaufort-Jasper Water & Sewer Authority (BJWSA)’s Great Swamp Effluent Disposal Expansion. This expansion project included extension of a new effluent pipe from Highway 278 to a new distribution header for effluent disposal and a new boardwalk. The project scope included professional […]

  • Crossroads 3.0 MGD WQCP, Savannah, GA

    Activated Sludge Treatment Facility Provisioned For Future Build-Out Phase I of the project consisted of designing a new 3.0 MGD activated sludge wastewater treatment facility including influent screens, grit removal, equalization, aeration basins, secondary clarifiers, effluent disk filters and UV disinfection. The plant is also equipped with aerobic digestion, belt filter press and truck loading […]

  • CCSD District 2 Stadium, Mt. Pleasant, SC

    Let them play and run together. Let them feel and learn life together. In 2016, the Design+Build team of Hill Construction/McMillan Pazdan Smith was selected to plan, design and construct a new District 2 stadium to be used as the home stadium for both Wando High School and the new Lucy Beckham High School. Meeting […]

  • Southeastern Spine Institute, Mt. Pleasant, SC

    Serving Patients’ Surgical Needs The new 70,000 SF, 3-story facility will house services such as diagnosis and imaging, clinical support, PT, pain management, as well as an Ambulatory Surgery Center (ASC). The ASC works symbiotically with East Cooper Medical Center in Mount Pleasant servicing many patients’ surgical needs. Hussey Gay Bell provided civil engineering services […]

  • St. Simons Island WWTP, St. Simons Island, GA

    St. Simons Island Wastewater Treatment Plant Upgrade The Design Build Team of Winter Construction and Hussey Gay Bell completed the treatment alternative evaluation, permitting, design and upgrade of the St. Simons, Georgia Wastewater Treatment Plant from 3 MGD to 4 MGD accomplishing startup of the upgrade within 24 months. Delays associated with permitting were minimized […]

  • BJWSA Water & Sewer Master Plan, Jasper County, SC

    Two Alternatives for Future Development The purpose of this document was to provide a master plan for a water distribution system to serve the potential developments outlined in the Land Use Study of South Jasper County. This Master Plan evaluates two alternatives for source water to South Jasper County; additional groundwater wells or master metered […]