• Center for Advanced Studies (CAS), Charleston, SC

    A New 600-Student, 100,000 SF Facility Led by architectural firm Stevens & Wilkinson in conjunction with local, WBE firm, Red Iron Architects, project scope consists of the design and construction of a new 600-student Center for Advanced Studies on the site where the Attaway-Heinsohn Stadium across East Montague Avenue from the high school will be […]

  • GPA Steamship Terminal, Port Wentworth, GA

    GPA Steamship Terminal, Port Wentworth, GA Redevelopment of the former Georgia Steamship property to provide a state-of-the-art trans-shipment facility including a 200,000 square foot warehouse, truck parking and container storage that utilizes three container stacks served by nine (9) electric rubber tire gantry cranes. It also includes a 900 square foot guardhouse with adjacent truck […]

  • 0.5 MGD Fripp Island WWTP, Fripp Island, SC

    A wastewater treatment plant on a sensitive natural tract This project consisted of a new 0.5 MGD hollow fiber (GE ZeeWeed) membrane bioreactor (MBR) plan constructed on a very sensitive tract of unused land surrounded by a golf course and residential properties.  This site required construction on an extremely small footprint and continued operation of […]

  • Mercer School of Medicine, Savannah, GA

    Phased Construction and Renovation for Higher Education Facility Hussey Gay Bell provided full-service architectural and engineering design services for this project which consisted of the overall renovation of 26,500 SF of the 60,000 SF William and Iffath Hoskins Center for Biomedical Research, as well as construction of a 30,000 SF addition to the Hoskins Center […]

  • SCCPSS Savannah High School, Savannah, GA

    Signature High School Project Continues Path of Excellence 20 Years Later Hussey Gay Bell provided architectural and engineering design services for this $17.6 million state-of-the-art High School.  The 200,000 SF, two-story school mimics Savannah’s historic architecture and is fronted by a Savannah Square. It was designed for 1,750 students and contains a Legal, Business and […]

  • MOB & Urgent Care Center, Dacula, GA

    Growing the Northeast Georgia Health System Project scope consisted of the design and construction of a new medical office building and urgent care center in Dacula, Georgia. The facility – Northeast Georgia Physicians Group Dacula – is part of the growing Northeast Georgia Health System. The 9,534 SF Dacula facility houses five providers and features […]

  • President Street WRF, Savannah, GA

    50 Years of Planning for Savannah’s Treatment Shift to Biosolids In the 1970s, Hussey Gay Bell, in association with Wiedeman & Singleton, designed the original secondary activated sludge wastewater treatment facility on President Street, which serves major ports of the City of Savannah and discharges effluent to the Savannah River with sludge disposal by incineration. […]

  • Memorial Emergency & Trauma Center, Savannah, GA

    Level 1 Trauma Center Doubles in Size This project consisted of the design, renovation and expansion of the existing emergency department, which is one of only four Level 1 trauma centers in the entire State of Georgia. The renovation and expansion construction took two (2) years and nearly doubled the number of treatment rooms available. […]

  • OFTC Sandersville Campus Reno, Sandersville, GA

    An 28,388 SF Overhaul for OFTC The Design-Build team of Hussey Gay Bell/Garbutt Construction provided full design and construction services for this project. Project scope consisted of the extensive renovation of the North Campus main building to create a Student Affairs Center featuring an Administrative Services Area, an improved Bookstore and Student Center and general-purpose […]




  
  • City of Jesup 2.5 MGD WWTP, Jesup, GA

    Jesup Embarks On Journey To New 2.5 MGD Wastewater Treatment Plant Hussey Gay Bell served as the Lead Engineer for the City’s new 2.5 MGD extended aeration activated sludge wastewater treatment plant facility, responsible for providing full design and construction phase services for the project which was constructed by Savannah-based, BRW Construction. The Jesup Wastewater […]

  • Stono River 24” Water Main, Charleston, SC

    An Emergency Water Main Replacement In A Coastal Setting In 2006, Charleston Water Systems (CWS)’s 24” water main that crosses the Stono River and runs parallel to Maybank Highway was seriously damaged by a barge anchor. At the time, the pipeline was one of two supplying potable water to John’s Island and Kiawah/Seabrook Islands. CWS […]

  • LCSD 1 Meadow Glen Middle School, Columbia, SC

    Challenging Topography Creates Magnificent Views Hussey Gay Bell provided architectural and engineering design for a new, 180,000 square foot Middle School facility with a core capacity of 1,000 students and an initial classroom capacity of 800 students. The school was designed around a Main Street concept with Administration being centrally located on the first floor […]

  • Homewood Suites by Hilton, Savannah, GA

    Homewood Suites by Hilton, a New View along the River Hussey Gay Bell provided civil engineering/site development services for this project which consisted of the design and construction of this eight-story, 162-unit Homewood Suites by Hilton Savannah Historic District / Riverfront hotel.  Featuring 162 studio and one-bedroom units, 2,000+ SF of meeting space, a green […]

  • Ben Sawyer/Intracoastal Waterway Water Main, Sullivan’s Island, SC

    Ben Sawyer/Intracoastal Waterway Water Main Crossing Project consists of the installation of approximately 5,750 LF of transmission water main to provide a third connection to a MPW owned water main located at Toler’s Cove in Mt. Pleasant. The scope includes a connection to CWS’s existing 20-inch transmission water main along Middle Street on Sullivan’s Island […]

  • Palmetto Dunes Resort, Hilton Head Island, SC

    2,000-Acre Palmetto Dunes Resort Master Planning & Designs For more than 50 years, Hussey Gay Bell has played a major role in the development of the Palmetto Dunes Resort at Hilton Head Island, South Carolina. The 2,000-acre development features over 2 1/2 miles of beach, fourteen (14) miles of interior lagoons and two (2) miles […]

  • Folly Road Publix, Charleston, SC

    A New Publix Center on James Island The Publix Center project consists of the redevelopment of an existing shopping center at the intersection of Folly Road and Grinball Road (Ft. Johnson Road) in the City of Charleston on James Island. The existing center was demolished and a new Publix Grocery, a junior tenant and multiple […]

  • Natural Gas System, Crockett County, TN

    Natural Gas Extension to Serve Gadsden and Surrounding Area The Crockett Public Utility District Natural Gas Extension to the Town of Gadsden has made high quality natural gas service available to approximately 250 potential new customers including an elementary school, a cotton gin, churches and residences, providing significant savings and convenience when compared to alternate […]

  • 3rd Brigade MP Headquarters, Fort Stewart, GA

    3rd Brigade Military Police Battalion Headquarters and Classroom Building The 3rd Brigade’s Military Police Battalion Headquarters and Classroom Building consists of a two-story, 12,586 SF headquarters building. It was constructed using a standing seam metal roof, concrete floors, steel stud/gypsum board interior wall system, a non-load bearing steel stud brick veneer exterior wall system. Interior […]