• PEN 3A Water Transmission Main, Charleston, SC

    48 and 36-inch water transmission main Hussey Gay Bell is currently providing engineering design services for the PEN 3A Water Transmission Main project, which includes all aspects of the design of the transportation main. Due to the magnitude of this project, construction will occur in two phases. Phase I connects the existing 48-inch water main […]

  • Augusta Broad St Improvements, Augusta, GA

    Augusta’s Infamous Broad Street Receives $84M Transformation This high-profile project consists of streetscape and pedestrian improvements and resurfacing of Broad Street from West of Milledge Road to East Boundary Street. The project is 100% Transportation Investment Act (TIA) funded urban corridor streetscape and pedestrian facility improvement project that follows the GDOT TIA Manual and adheres […]

  • Secession Effluent Force Main, Beaufort, SC

    A World Record Is Set Under Navigable Waters From 2006-2007, Hussey Gay Bell provided professional services to Beaufort-Jasper Water & Sewer Authority (BJWSA) for complete engineering design of 5,000 LF of fused 10-inch PVC DR 14 effluent force main installed using horizontal directional drilling; 3,000 LF of 10-inch PVC effluent force main installed using direct […]

  • Hugo Boss Distribution Center, Midway, GA

    165,000 SF Distribution Center Brings Jobs to Midway, GA This project consisted of a 165,000 SF warehouse/distribution center located in Midway, Georgia.  The structure is load bearing tilt with an EPDM roof supported by joists and joists girders. Clear height is 34 feet.  Approximately 8,000 SF of office space is included inside the tilt box.  […]

  • Water & Sewer Master Plans, Statesboro, GA

    Nearly 35 Years of Service & Infrastructure The City of Statesboro has been a client of Hussey Gay Bell’s for nearly 35 years. During that period, Hussey Gay Bell has designed over 150 infrastructure projects for the City ranging from new location water and system to system extensions and rehab for water, sewer and drainage, […]

  • EcoPark – Forsyth County, GA

    EcoPark, Forsyth County, GA This 38-acre multipurpose complex located along Shiloh Road in Forsyth County was developed as an office and manufacturing site. The first phase of the complex includes a dramatic office on piers “floating” adjacent to Bagley Creek. The 3.76-acre site incorporates a 49,000 SF signature facility with approximately 21 acres of natural […]

  • Gulfstream Wing Assembly Building, Savannah, GA

    Gulfstream Continues Growth In Savannah Market With Wing Plant The project consisted of the design and construction of the new Gulfstream Wing Assembly Facility located adjacent to existing Building Y on the Gulfstream Savannah campus. Hussey Gay Bell provided complete planning and A/E design services for this 223,615 SF fully sprinklered facility which includes add-alternates […]

  • Bacon Park Reuse Main Improvements, Savannah, GA

    Drilling 5 Miles of Pipe In The Name of Reuse This project consists of a new 16-inch diameter reuse water main from the President Street Water Reclamation Facility to the Bacon Park Golf Course and improvements to the reuse water pumping facilities at the President Street facility. The proposed reuse water main is approximately 29,000 […]




  
  • S-90 Bridge Replacement, Newberry County, SC

    An Innovative Decked Bulb Tee Superstructure over CSX Railroad This project involves the replacement of the S-90 (Boundary Street) Bridge over CSX & NS Railroads in Newberry, South Carolina.  The existing bridge is a structurally deficient four span structure which was built in 1925.  The proposed replacement structure consists of a single span decked bulb […]

  • MU Science Center, Macon, Georgia

    Mercer University Spearman C. Godsey Science Center, Macon, Georgia: Learning Labs in Motion Designer of Record, Hussey Gay Bell, led the planning and A/E services for this $44M project – the largest capital expenditure in the University’s history –which consisted of design and construction of a new, 4-story state-of-the-art teaching and research facility.  The facility features […]

  • Camden Truck Route, Kershaw County, SC

    Safer Operations along Existing Truck Routes This project was developed to improve three segments of designated truck routes within the City of Camden in order to improve the truck operations and safety along the existing designated truck routes with a cumulative total length of 4.7 miles as follows: S-897 / Ehrenclou Drive and S-45 / […]

  • Pooler Municipal Complex, Pooler GA

    A Regional Symbol in the Trend Towards New Urbanism While the very nature of this project implies creativity in and adhere to neoclassical architectural design, from multiple parcels and PIN numbers, underground storage tanks, utility conflicts, an occupied site and limited access and parking to siting a critical facility around contaminated soils, this project literally […]

  • Lady’s Island Force Main Diversion, Beaufort, SC

    An Alternative Sewer System Beaufort-Jasper Water & Sewer Authority (BJWSA) selected Hussey Gay Bell to provide professional engineering services to design the implementation of an alternative sewer system, which will divert the Authority’s sewer flows generated by the Lady’s Island sewer system from BJWSA’s St. Helena Wastewater Treatment Plant to the Port Royal Island Wastewater […]

  • OFTC Sandersville Campus Reno, Sandersville, GA

    An 28,388 SF Overhaul for OFTC The Design-Build team of Hussey Gay Bell/Garbutt Construction provided full design and construction services for this project. Project scope consisted of the extensive renovation of the North Campus main building to create a Student Affairs Center featuring an Administrative Services Area, an improved Bookstore and Student Center and general-purpose […]

  • Garden City Annexation, Garden City, GA

    Water & Sewer Master Planning for a Municipality Garden City was one of Hussey Gay Bell’s first clients, beginning in 1958. Since that time, Hussey Gay Bell has continued to provide services as one of their long-term engineering consultants. Hussey Gay Bell has handled their infrastructure master planning and design including wastewater treatment, sewage collection, […]

  • UAC & Shoot House, Fort Stewart, GA

    Urban Assault Course and Shoot House The Urban Assault Course consisted of a new facility with five training stations (Individual Team Trainer, a Squad Trainer, a Gredadier Gunnery Trainer, an Offense/Defense Building, and an Underground Trainer), an operations/storage building, an observation tower and a latrine facility. Realistic, reconfigurable human targetry, both combatant and non-combatant, with […]

  • Bacon Park Reuse Main Improvements, Savannah, GA

    Drilling 5 Miles of Pipe In The Name of Reuse This project consists of a new 16-inch diameter reuse water main from the President Street Water Reclamation Facility to the Bacon Park Golf Course and improvements to the reuse water pumping facilities at the President Street facility. The proposed reuse water main is approximately 29,000 […]