• Whale Branch Early College High School, Seabrook, SC

    A New High School Aiming for Higher Education Hussey Gay Bell provided architectural, interior, and structural engineering design services for this project which consisted of the design and construction of this new, 180,000 SF early college high school on 65 acres in the north area of Beaufort County, South Carolina. Designed to house approximately 1,000 […]

  • Toombs County Courthouse, Lyons, GA

    Toombs County Courthouse and Detention Center The project consists of the development of a Feasibility Study for the Toombs County Courthouse and Detention Center. The Toombs County Courthouse, built in 1964 is located on a 6.56-acre site and currently houses court functions and county administrative offices. The 125-bed Detention center was built on 4.82 acres […]

  • GCPS Meadowcreek Cluster Elementary School, Tucker, GA

    Tight Sight Leads to Smarter Footprint for New School The New Meadowcreek Cluster Elementary School is proposed for one of the few remaining open parcels in the Tucker area of fast growing Gwinnett County.  The tight sight, challenging project budget and significant presence of sub-surface rock were all prominent factors in the design of the […]

  • Secession Effluent Force Main, Beaufort, SC

    A World Record Is Set Under Navigable Waters From 2006-2007, Hussey Gay Bell provided professional services to Beaufort-Jasper Water & Sewer Authority (BJWSA) for complete engineering design of 5,000 LF of fused 10-inch PVC DR 14 effluent force main installed using horizontal directional drilling; 3,000 LF of 10-inch PVC effluent force main installed using direct […]

  • Whole Foods at West Ashley Station, Charleston, SC

    Antiquated Shopping Center Revitalized Through Smart Development West Ashley is the key to future development for the City of Charleston.  As the Charleston area is projected to reach 1 million inhabitants in the next ten to fifteen years, much of that development and densification is expected to happen in the West Ashley area. West Ashley’s […]

  • Port Access Road Utility Coordination, Charleston, SC

    Utility Relocation for Planned Roadway Improvements This $225M project includes relocation of water utilities that are in conflict with the planned roadway improvements associated with the new Port Access Road, which will provide access from the proposed marine terminal to I-26 while maintaining service for commuters. The project will be completed independently by a Charleston […]

  • Gold Mine Park, Sugar Hill, GA

    Gold Mines, History & A 16-Mile Trail The City of Sugar Hill is planning to redevelop 440 Level Creek Road for use as a park, which will be called Gold Mine Park. The park is proposed to serve as a trailhead along the greenway which passes through the proposed Gold Mine Park, providing parking and […]

  • UGA Equestrian Clubhouse, Bishop,GA

    A New Home for National Leaders in Varsity Equestrian The Design-Bid-Build project consists of the design and construction of a new women’s varsity team equestrian clubhouse. The clubhouse will be approximately 7,000 SF and located at the 109-acre UGA Equestrian Complex in Bishop, Georgia. The facility will be comprised of an entry lobby with a […]

  • Garden City Annexation, Garden City, GA

    Water & Sewer Master Planning for a Municipality Garden City was one of Hussey Gay Bell’s first clients, beginning in 1958. Since that time, Hussey Gay Bell has continued to provide services as one of their long-term engineering consultants. Hussey Gay Bell has handled their infrastructure master planning and design including wastewater treatment, sewage collection, […]




  
  • Effingham County Admin Complex, Springfield, GA

    Narrowing the Gap Between County Services In 2016, Hussey Gay Bell was selected to provide site selection, programming, cost estimating and conceptual design services for the County’s proposed Administrative Complex in an effort to centralize County services. The Effingham County Board of Commissioners currently operates close to 80 sites for the citizens of Effingham County. […]

  • Avita New Behavioral Health Center, Gainesville GA

    A New Behavioral Health Center in Gainesville Hussey Gay Bell is providing programming and full architectural design, structural engineering, permitting, bidding and construction phase services for a $8M new behavioral health center in Gainesville, GA.  Civil engineering services are being provided by our subconsultant. The building will be a 45,000 SF multi-function facility located on […]

  • East Rocky Branch Sewer Improvements, Columbia, SC

    Replacing Large Diameter Pipe In An Urban Setting Project scope consists of the replacement of the sanitary sewer piping to upsize the existing piping from Manhole SS-RB05-05541-MH to Manhole SS-RB05-14373-MH for a distance of approximately 4,700 LF with new 36-inch diameter gravity sewer located along Rocky Branch. Phase II also includes the replacement of sanitary […]

  • GCPS Meadowcreek Cluster Elementary School, Tucker, GA

    Tight Sight Leads to Smarter Footprint for New School The New Meadowcreek Cluster Elementary School is proposed for one of the few remaining open parcels in the Tucker area of fast growing Gwinnett County.  The tight sight, challenging project budget and significant presence of sub-surface rock were all prominent factors in the design of the […]

  • Savannah Arena, Savannah, GA

    A First-Class Arena Takes Shape In Savannah’s Canal District To pursue the City of Savannah’s ultimate objective to build a first-class, sustainable arena that provides a flexible and usable sports and entertainment venue to the public, the City selected design prime, Perkins+Will along with local civil engineering firm, Hussey Gay Bell, to provide design and […]

  • Sylvania WWTP Improvements, Sylvania, GA

    Sylvania Wastewater Treatment Plant Improvements The project consisted of the demolition and replacement of six (6) surface aerators in the aerator basins, modification of aeration basin influent and return sludge piping, demolition and replacement of mechanical equipment in the existing concrete tanks of two clarifiers, construction of one new concrete clarifier, installation of one new […]

  • Natural Gas System Improvements, Portland, TN

    Natural Gas System Improvements to Strengthen Distribution System Hussey Gay Bell is in the third phase of designing natural gas system improvements for the City of Portland following an initial natural gas system analysis. The Phase III Natural Gas System Improvements project seeks to provide previously unserved areas within the City of Portland and Sumner […]

  • 0.5 MGD Fripp Island WWTP, Fripp Island, SC

    A wastewater treatment plant on a sensitive natural tract This project consisted of a new 0.5 MGD hollow fiber (GE ZeeWeed) membrane bioreactor (MBR) plan constructed on a very sensitive tract of unused land surrounded by a golf course and residential properties.  This site required construction on an extremely small footprint and continued operation of […]

  • Memorial Heart & Vascular ICU, Savannah, GA

    Where the Heart Goes to Heal As the Architect of Record, Hussey Gay Bell designed an environment that inspires and promotes healing. Project scope consisted of the build-out of approximately 25,000 SF of shell space on the 5th floor of the existing Heart and Vascular Building located on the campus of Memorial University Medical Center. […]