• Bluffton Area Sewer Master Plan, Town of Bluffton, SC

    Joint Venture & Phased Approach Hussey Gay Bell’s project scope consisted of the development of a master plan to determine the most economical way to extend Beaufort-Jasper Water & Sewer Authority (BJWSA) sewer service to an annexed 624-acre area about 1.6 miles northwest of the Town of Bluffton. The proposed gravity sewers, two new lift […]

  • Central Berkeley WWTP Upgrade to 6 MGD, Moncks Corner, SC

    Central Berkeley WWTP Upgrade to 6 MGD Hussey Gay Bell is providing design services for this project which consists of the upgrade of the existing Central Berkeley Wastewater Treatment Facility – a modified activated sludge treatment facility currently permitted to treat 3 million gallons per day (MGD) of domestic wastewater – to flow capacity 6 […]

  • GPA Colonel’s Island Bulk Facility, Brunswick, GA

    Facilities Grow as Import and Export Grow The automobile processing business has continued to grow in recent years and has generated high demand for additional property. In order to satisfy this demand, GPA’s need to develop approximately 70 acres into RO/RO parking within the existing Colonel’s Island Bulk Facility area had become of paramount importance […]

  • Hugo Boss Distribution Center, Midway, GA

    165,000 SF Distribution Center Brings Jobs to Midway, GA This project consisted of a 165,000 SF warehouse/distribution center located in Midway, Georgia.  The structure is load bearing tilt with an EPDM roof supported by joists and joists girders. Clear height is 34 feet.  Approximately 8,000 SF of office space is included inside the tilt box.  […]

  • Water & Sewer Master Plans, Statesboro, GA

    Nearly 35 Years of Service & Infrastructure The City of Statesboro has been a client of Hussey Gay Bell’s for nearly 35 years. During that period, Hussey Gay Bell has designed over 150 infrastructure projects for the City ranging from new location water and system to system extensions and rehab for water, sewer and drainage, […]

  • Broad Creek WWTP, Hilton Head Island, SC

    Innovative Approach To Wastewater Treatment And Effluent Discharge Design Project scope consisted of the design and construction of a 2.1 MGD activated sludge plant incorporating total reuse of liquid and solid produced at plant. Liquid used for irrigation of three (3) golf courses. Solids were used to produce compost, which was given to residents for […]

  • Savannah Portside Int’l Park, Effingham County, GA

    1,600-Acres of Portside Property Slated for Growth For over 10 years, Hussey Gay Bell has been engaged in the due-diligence and infrastructure planning for this new industrial park situated at Old River Road and Interstate 16.  With direct access to the Port of Savannah via rail, this 1,600-acre tract is prepped for future expansion for […]

  • Beaufort Fire Station No.2, Beaufort, SC

    A Seamless Blend of Low Country Charm & Public Safety For this $2.8M Design-Bid-Build project, Hussey Gay Bell provided professional architectural and engineering services for this new facility which consists of a 10,000 SF, two-story, fire station on a 1.2-acre parcel. The building is located at the front of the site as required by the […]

  • VA Primary Care Center, Hinesville, GA

    A Facility for Soldiers & Their Families This 1-story, 32,000 SF Outpatient Clinic located in Hinesville, Georgia was designed for the Department of Veterans Affairs (VA). The 7-acre site includes a covered patient drop-off area, parking areas for patients and staff, as well as a wellness-walking trail. The clinic was designed to house four separate […]




  
  • Secession Effluent Force Main, Beaufort, SC

    A World Record Is Set Under Navigable Waters From 2006-2007, Hussey Gay Bell provided professional services to Beaufort-Jasper Water & Sewer Authority (BJWSA) for complete engineering design of 5,000 LF of fused 10-inch PVC DR 14 effluent force main installed using horizontal directional drilling; 3,000 LF of 10-inch PVC effluent force main installed using direct […]

  • Main Entry Gate, Fort Stewart, GA

    Rerouted GA Highway 38 & 119 Leads to the New Main Entry Gate and Visitors Center The project consisted of establishing a new main entry gate location into Fort Stewart and was designed to comply with the Army standard design for Access Control Points. For the project, existing Georgia Highways 119 and 38 were demolished […]

  • Orange Grove Charter School, Charleston, SC

    Orange Grove Elementary Charter School, school of acceptance Hussey Gay Bell provided site/civil engineering services to Altman Architectural Group for this 725-student elementary school, which serves students in kindergarten through fourth grade.  The firm coordinated traffic, geotechnical, parking, archaeological, wetlands and environmental services.  In addition, Hussey Gay Bell provided site improvements to McNair Elementary School […]

  • 8 Oaks Regional Park, Phase I, Georgetown County, SC

    Play Here, No Matter the Sport Hussey Gay Bell, in association with Wood+Partners, Inc., completed the master planning for 8 Oaks Regional Park consisting of a nine-baseball field tournament complex, ten tennis courts, four soccer/multi-purpose fields, skate park, playground, pool, camping facilities and recreational trails on a 360-acre site. Phase I has been completed and […]

  • Enmarket Arena, Savannah, GA

    A First-Class Arena Takes Shape In Savannah’s Canal District As the largest capital expenditure in the City’s history, the Enmarket Arena project represents the culmination of nearly 20 years of efforts to construct a first-class, sustainable arena that provides a flexible and usable sports and entertainment venue to the public.  Originally funded by the City’s […]

  • Dean Forest Road 24” Main, Savannah, GA

    Connecting Savannah, Pooler and Garden City Through Water Service The existing water main follows the Dean Forest Road corridor of the City of Savannah, with property on either side existing within the City of Pooler and Garden City. As a result, the City had no water service paying customers along the existing route. The impetus […]

  • Lady’s Island Force Main Diversion, Beaufort, SC

    An Alternative Sewer System Beaufort-Jasper Water & Sewer Authority (BJWSA) selected Hussey Gay Bell to provide professional engineering services to design the implementation of an alternative sewer system, which will divert the Authority’s sewer flows generated by the Lady’s Island sewer system from BJWSA’s St. Helena Wastewater Treatment Plant to the Port Royal Island Wastewater […]

  • Avita New Behavioral Health Center, Gainesville GA

    Avita Community Partners New Behavioral Health Crisis Center in Gainesville Located off of Old Cornelia Highway in Gainesville, Georgia, this new 28,000 SF mental health crisis center replaces an existing and aging center in Flowery Branch, GA. The new center includes a state-of-the-art peer living room, 24-hour walk-in crisis center, a 23-hour temporary observation unit […]

  • Hooker Furnishings, Midway, GA

    The Future Of Distribution Is Here, 8 Football Fields In Length Hussey Gay Bell provided architectural design services for this new 1,426,000 square foot distribution facility located strategically less than 35 miles from the Port of Savannah, in the Georgia Ready for Accelerated Development (GRAD) certified Tradeport East Business Center in Liberty County, GA. The […]