As the Prime, Hussey Gay Bell is providing architectural, civil and structural services for the repurpose of 6 existing buildings and a new dining facility in the 17-acre YCA campus at Fort Gordon.

Hussey Gay Bell team’s efforts for the project are to help the GSFIC and the Youth Challenge Academy reach their goals, balance scope with their budget and schedule, and proceed with phased constructions accordingly.

This project is composed of 2 parts, a phased complete renovation of existing buildings and construction of a new dining facility. The buildings to be renovated are 1-story buildings and originally built in the 1960s. The phased renovation of the existing buildings will consist of 4 barracks and 2 classroom buildings; and the new dining facility is being designed for 300+ cadets.

Civil/sitework design services are associated with construction of a new dining facility including site demolition, erosion and sediment control measures, layout, staking, paving, grading, onsite drainage, on-site water and gravity sewer service, and landscape/tree ordinance design for the site.

Youth Challenge Academy, Fort Gordon, GA

Fort Gordon Youth Challenge Academy (YCA) is a high school level school with military organization. The YCA campus is a 17-acre site consisting of 18 repurposed buildings originally constructed in the 1960’s and 1970’s, which are in dire need of renovation. Also, the current dining facility is not adequate in size and in a state of disrepair. Hussey Gay Bell team’s efforts for the project are to help the GSFIC and the User reach their goals, balance scope with their budget and schedule, and proceed with phased constructions accordingly.