Foster Creek Road 24-inch Water Transmission Main
Hussey Gay Bell is providing design services for the replacement of an existing 16-inch prestressed concrete transmission main with a new 24-inch transmission main. The first phase includes the installation of approximately 3,500 LF of water main under the Goose Creek Reservoir by HDD and installation of approximately 1,500 LF of 24” ductile iron water main by open cut.