Bolivar’s 1.4 MGD Plant Receives An Upgrade
Scope of work consisted of the preparation of environmental, preliminary and final engineering reports, construction administration, construction observation and project close-out for the installation of approximately 11,000 linear feet of 14-inch force main, upgrading an existing pump station, aeration equipment, yard piping and structures, settling basins, flow measurement and instrumentation, a control building and laboratory, electrical service, access roads and sitework, an outfall structure, disinfection and all related appurtenances.