• 3rd Brigade MP Headquarters, Fort Stewart, GA

    3rd Brigade Military Police Battalion Headquarters and Classroom Building The 3rd Brigade’s Military Police Battalion Headquarters and Classroom Building consists of a two-story, 12,586 SF headquarters building. It was constructed using a standing seam metal roof, concrete floors, steel stud/gypsum board interior wall system, a non-load bearing steel stud brick veneer exterior wall system. Interior […]

  • 2025 Water & Sewer Master Plan, Bryan County, GA

    Future Growth and Development for Bryan County In 2005, Hussey Gay Bell assisted Bryan County with the development of this water and sewer master plan as a planning tool for infrastructure required to meet the 2025 potable water and sanitary sewer demands of the County, which currently has little to no infrastructure. The study defined […]

  • 2004 Master Plan & 2013 Update, Pooler, GA

    Water & Sewer Master Plan & Update for Pooler Since 1963, Hussey Gay Bell has been Pooler’s primary consultant for engineering and surveying services. Hussey Gay Bell has served Pooler by performing design of water, sewer and drainage system improvements; assisting with City ordinances and master specifications; securing state and federal (GEFA) funding for their […]

  • 2,300-Acre Waterways Township, Bryan County, GA

    Experiencing Life on the Water:  2,300 Acres of Scenic Development Hussey Gay Bell continues to provide planning and design services for this 2,300-acre self-contained residential and commercial community development which consists of approximately 2,900 single family residential units, 300 resort units, a 25-acre municipal utility complex, 200-acre golf course, 100-acre mixed-use village center and amenity […]

  • 0.5 MGD Fripp Island WWTP, Fripp Island, SC

    A wastewater treatment plant on a sensitive natural tract This project consisted of a new 0.5 MGD hollow fiber (GE ZeeWeed) membrane bioreactor (MBR) plan constructed on a very sensitive tract of unused land surrounded by a golf course and residential properties.  This site required construction on an extremely small footprint and continued operation of […]