South Carolina

500 333 Hussey Gay Bell

Foster Creek Road Water Main, Charleston, SC

Foster Creek Road 24-inch Water Transmission Main Hussey Gay Bell is providing design services for the replacement of an existing 16-inch prestressed concrete transmission main with a new 24-inch transmission…

read more
500 333 Hussey Gay Bell

Rosewood Area Water System, Columbia, SC

Rosewood Area Water System Improvements In conjunction with the City of Columbia’s aging water system improvement efforts, project consists of the design of approximately 116,000 LF of 6″, 8″, and…

read more
500 333 Hussey Gay Bell

PEN 3A Water Transmission Main, Charleston, SC

48 and 36-inch water transmission main Hussey Gay Bell is currently providing engineering design services for the PEN 3A Water Transmission Main project, which includes all aspects of the design…

read more
500 333 Hussey Gay Bell

Southeastern Spine Institute, Mt. Pleasant, SC

Serving Patients’ Surgical Needs The new 70,000 SF, 3-story facility will house services such as diagnosis and imaging, clinical support, PT, pain management, as well as an Ambulatory Surgery Center…

read more
500 333 Hussey Gay Bell
Cemplank facility

Cemplank Inc. Mfg Facility, Summerville, SC

Belgium-Based Company Lands New Manufacturing Facility Belgium-based CEMPLANK, Incorporated’s new manufacturing facility in Summerville, South Carolina, is a 172,000 SF pre-engineered structure and a 7,000 SF three-story implantation process control…

read more
500 333 Hussey Gay Bell
Boeing Aerial

Boeing Land Development Projects, North Charleston, SC

600+ acre multi-county Industrial/Commercial Park Boeing acquired Vought Aircraft/Global Aeronautica in 2008 and announced plans for a new Boeing 787 manufacturing facility adjacent to the Charleston International Airport in 2009.…

read more
500 333 Hussey Gay Bell

Camden Truck Route, Kershaw County, SC

Safer Operations along Existing Truck Routes This project was developed to improve three segments of designated truck routes within the City of Camden in order to improve the truck operations…

read more
500 333 Hussey Gay Bell

Center for Advanced Studies (CAS), Charleston, SC

A New 600-Student, 100,000 SF Facility Led by architectural firm Stevens & Wilkinson in conjunction with local, WBE firm, Red Iron Architects, project scope consists of the design and construction…

read more
500 333 Hussey Gay Bell

West Ashley Sewer Tunnel, Charleston, SC

120’ Below Earth’s Surface:  A Journey to Fix Charleston’s Deep Tunnel System From 2002 to 2008, Hussey Gay Bell was involved in Phases II-IV leading up to the Phase V…

read more
500 333 Hussey Gay Bell

Master Plan & Contingency Plan, Charleston, SC

A Sewer Tunnel System Replacement & Contingency Plan As a result of the STAG monies obtained through the Corps of Engineers, Hussey Gay Bell and Black & Veatch teamed to…

read more