Water

500 333 Hussey Gay Bell

Lady’s Island Force Main Diversion, Beaufort, SC

An Alternative Sewer System Beaufort-Jasper Water & Sewer Authority (BJWSA) selected Hussey Gay Bell to provide professional engineering services to design the implementation of an alternative sewer system, which will…

read more
500 333 Hussey Gay Bell

East Rocky Branch Sewer Improvements, Columbia, SC

Replacing Large Diameter Pipe In An Urban Setting Project scope consists of the replacement of the sanitary sewer piping to upsize the existing piping from Manhole SS-RB05-05541-MH to Manhole SS-RB05-14373-MH…

read more
500 333 Hussey Gay Bell

Key Slot, Godley Station & Towne Lake, Pooler, GA

A Phased Approach to Planning Growth This project consisted of the design and installation of approximately 5,400 LF of 12-inch diameter C-900 PVC force main. The project included pump station…

read more
500 333 Hussey Gay Bell

Ashley River 36″ Water Main, Charleston, SC

Subaqueous Drilling in the Charleston Peninsula The project scope generally consisted of the design and construction of a water transmission main between North Charleston and West of the Ashley River.…

read more
500 333 Hussey Gay Bell

Wastewater Reclamation Facility, Richmond Hill, GA

Sterling Creek Water Reclamation Facility: An Evolution in Wastewater Treatment The City’s original wastewater treatment plant with overland flow fields and constructed wetlands was built in the 1990s. The wetland…

read more