Distribution

500 333 Hussey Gay Bell

Foster Creek Road Water Main, Charleston, SC

Foster Creek Road 24-inch Water Transmission Main Hussey Gay Bell is providing design services for the replacement of an existing 16-inch prestressed concrete transmission main with a new 24-inch transmission…

read more
500 333 Hussey Gay Bell

Rosewood Area Water System, Columbia, SC

Rosewood Area Water System Improvements In conjunction with the City of Columbia’s aging water system improvement efforts, project consists of the design of approximately 116,000 LF of 6″, 8″, and…

read more
500 333 Hussey Gay Bell

PEN 3A Water Transmission Main, Charleston, SC

48 and 36-inch water transmission main Hussey Gay Bell is currently providing engineering design services for the PEN 3A Water Transmission Main project, which includes all aspects of the design…

read more
500 333 Hussey Gay Bell

Pooler Reuse Water Distribution, Pooler, GA

Large-Scale Infrastructure for Pooler The Pooler Reuse Water Distribution System Upgrades consisted of two extensions to the City of Pooler’s reuse water distribution system to provide reclaimed water to the…

read more
500 333 Hussey Gay Bell

Stono River 24” Water Main, Charleston, SC

An Emergency Water Main Replacement In A Coastal Setting In 2006, Charleston Water Systems (CWS)’s 24” water main that crosses the Stono River and runs parallel to Maybank Highway was…

read more
500 333 Hussey Gay Bell

East Cooper Water Supply No. 2, Charleston, SC

60,000 Residents Receive Drinking Water, Fire Protection An ACEC-SC-award winning project, this project reached final completion in 2007. Hussey Gay Bell played a crucial role in the success of Charleston…

read more
500 333 Hussey Gay Bell

Dean Forest Road 24” Main, Savannah, GA

Connecting Savannah, Pooler and Garden City Through Water Service The existing water main follows the Dean Forest Road corridor of the City of Savannah, with property on either side existing…

read more
500 333 Hussey Gay Bell

Port Access Road Utility Coordination, Charleston, SC

Utility Relocation for Planned Roadway Improvements This $225M project includes relocation of water utilities that are in conflict with the planned roadway improvements associated with the new Port Access Road,…

read more
500 333 Hussey Gay Bell

Church, Tradd, Queen & Legare, Charleston, SC

An Upgrade for 1800s Water Mains In 2013, Hussey Gay Bell’s professional design staff reached final completion on the construction phase of this project which consisted of the replacement of…

read more
500 333 Hussey Gay Bell

Bacon Park Reuse Main Improvements, Savannah, GA

Drilling 5 Miles of Pipe In The Name of Reuse This project consists of a new 16-inch diameter reuse water main from the President Street Water Reclamation Facility to the…

read more
  • 1
  • 2